- 관리자
- 조회 수 108699
- 댓글 수 7
- 추천 수 0
구본형 변화경영연구소 웹진, <CHANGE2011> 1월호가 나왔습니다.
2011년을 여는 신년호입니다. 자세한 내용은 아래를 참고하세요.
Change2011_01.pdf => 웹진 다운로드
Change2011_01.pdf => 웹진 다운로드
Classification of steel scaffolding load
A steel scaffolding load Category:
1.1, the load acting on the scaffold can be divided into permanent load (constant load) and a variable load (live load).
1.2 The permanent load (constant load) can be divided into:
(1) scaffolding structure weight, including the pole, vertical horizontal bar, horizontal bar horizontal, scissors, lateral bracing, and fasteners such as self-respect;
(2) structure, accessory weight, including the scaffold boards, railings, block feet, safety nets and other protective facilities of the weight.
1.3 Variable load (live load) can be divided into:
(1) construction load, including the operating level on the personnel, equipment and materials, self-respect;
(2) wind load.
2 standard value Load
Standard value of 2.1 permanent load shall meet the following requirements:
(1) per meter pole structures to withstand the weight of the standard value, should be in accordance with this specification in Appendix A Table A-1 uses;
(2) stamped steel scaffold boards, wood panels and bamboo scaffold scaffold board Strings weight standard value, Table 4.2.1-1 should be used;
WIND LOAD scaffolding type coefficient μs
Note: 1. μstw value can be considered scaffolding truss, under the current national standard "building structures norms" (GBJ 9) Table 6.3.1 Section 32 and Section 36 shall be computed;
2. φ is the wind factor, φ = 1.2An/AW, where An area for the wind; AW for the frontal area. Open single, double scaffolding φ value should be in accordance with this specification in Appendix A Table A-3 adoption.
3 load effect combination
3.1 The design of scaffolds bearing members should be based on the use of load may occur during the most unfavorable combination of whichever calculation, load effect combination should be used in accordance with Table 4.3.1.
February 25 more knowledge of scaffolding and aluminum beam description, please visit this site and the scaffolding zblog to the website: http://www.iscaffold.com.cn 24 hour customer service phone!
link:>> waterproof connectors
Door type scaffolding system characteristics
Bowl buckle type scaffolding sub-system characteristics
Adaptability of steel scaffolding Cuplock
Button steel scaffolding shortcomings bowl
Advantages of steel scaffolding Cuplock
With steel scaffolding adaptive
Disadvantage with steel scaffolding
Advantage with steel scaffolding
Adaptability of steel tubular scaffolding
Steel tubular scaffolding defects
Advantages of steel tubular scaffolding
scaffolding workers fixed by the operating mode of nodes
scaffolding components of the fixation by way of connection and installation location by
scaffolding pole at the bar and the vertical force between the mode of transmission
Steel scaffolding material divided by bars
A brief overview of scaffolding
Calculation of a number of other scaffolding works
Scaffolding engineering calculation decoration
Calculation of Reinforced Concrete Frame scaffolding
Masonry scaffolding engineering calculation
General rules for individual scaffolding
General scaffolding engineering calculation rules
Features round pin type scaffolding system
scaffolding of the quality requirements
<a href="http://www.salebelstaffuk.com/belstaff-bags.html/" rel="dofollow"><b>belstaff colonial bag</b></a><br>
<a href="http://www.salebelstaffuk.com/belstaff-bags.html/" rel="dofollow"><b>belstaff shoulder bag</b></a><br>
<a href="http://www.salebelstaffuk.com/belstaff-bags.html/" rel="dofollow"><b>belstaff travel bag</b></a><br>
<a href="http://www.salebelstaffuk.com/belstaff-bags.html/" rel="dofollow"><b>belstaff canvas bag</b></a><br>
<a href="http://www.salebelstaffuk.com/belstaff-bags.html/" rel="dofollow"><b>belstaff large man bag</b></a><br>